Owned nominal net cost
$55,000,000Build vs. Colocate
Compare nominal project ownership expense with an escalating colocation fee over an identical term.
Free · Manual inputs · No sign-in- 01Set the assumptions
6 inputs. Replace the examples with values for your scenario.
- 02Explore the result
Change an input to see how the estimate responds.
- 03Check the source
Use the formula and limitations below before acting.
Build your scenario
Enter illustrative values. Everything runs locally in your browser; this tool does not send your scenario to a server.
Upfront build and equipment expenses for a comparable capacity.
Operating cost under ownership, excluding already entered upfront CAPEX.
Comparable recurring colocation charge at the beginning of the term.
Annual percentage increase to colocation MRC.
Whole months compared for both alternatives.
Hypothetical recoverable value at term end; do not assume sale proceeds are guaranteed.
Example values are for demonstration only, not detected site, circuit or contract settings.
Your results
Colocation nominal contract cost
$42,247,315.97Colo less owned (+ means owned cheaper)
-$12,752,684.03Owned initial capital requirement
$50,000,000Bars share a zero baseline and scale. Values reflect your current assumptions.
Owned net cost = initial CAPEX + owned operating costs − assumed residual asset value; colo cost = sum of escalating monthly contract charges.
Undiscounted nominal-dollar comparison, not an NPV. No taxes, financing, insurance, upgrades, property appreciation, tenant improvements, capacity risk or salvage liquidity unless explicitly reflected in entered values.
Ready for a deeper answer?
Free calculators model numbers you supply. A future paid workflow will connect source-cited contract terms, billing reconciliation, expert verification and reporting—subject to security and acceptance approval. No paid service is activated here.