Build vs. Colocate

Compare nominal project ownership expense with an escalating colocation fee over an identical term.

Free · Manual inputs · No sign-in
Commercial modelCONCEPT VIEW
COST MODELΣ
01Power02Lease03Term
Connect the cost components before comparing the total.
  1. 01
    Set the assumptions

    6 inputs. Replace the examples with values for your scenario.

  2. 02
    Explore the result

    Change an input to see how the estimate responds.

  3. 03
    Check the source

    Use the formula and limitations below before acting.

01 / MODEL INPUTS

Build your scenario

Enter illustrative values. Everything runs locally in your browser; this tool does not send your scenario to a server.

Upfront build and equipment expenses for a comparable capacity.

Operating cost under ownership, excluding already entered upfront CAPEX.

Comparable recurring colocation charge at the beginning of the term.

Annual percentage increase to colocation MRC.

Whole months compared for both alternatives.

Hypothetical recoverable value at term end; do not assume sale proceeds are guaranteed.

Example values are for demonstration only, not detected site, circuit or contract settings.

02 / LIVE ESTIMATES

Your results

Calculated

Owned nominal net cost

$55,000,000

Colocation nominal contract cost

$42,247,315.97

Colo less owned (+ means owned cheaper)

-$12,752,684.03

Owned initial capital requirement

$50,000,000
THE SAME SCOPE, SIDE BY SIDE
Owned nominal net cost$55,000,000
Colocation nominal contract cost$42,247,315.97

Bars share a zero baseline and scale. Values reflect your current assumptions.

HOW IT WORKS

Owned net cost = initial CAPEX + owned operating costs − assumed residual asset value; colo cost = sum of escalating monthly contract charges.

IMPORTANT LIMITATIONS

Undiscounted nominal-dollar comparison, not an NPV. No taxes, financing, insurance, upgrades, property appreciation, tenant improvements, capacity risk or salvage liquidity unless explicitly reflected in entered values.

ENTERPRISE · CONTRACT-LINKED

Ready for a deeper answer?

Free calculators model numbers you supply. A future paid workflow will connect source-cited contract terms, billing reconciliation, expert verification and reporting—subject to security and acceptance approval. No paid service is activated here.

Ask about enterprise analysis ↗
© ColoPreflight LLC · Illustrative planning estimates only · No customer data uploads or automated contract interpretation