Protected circuit rating
4.99 kVANominal capacity at the selected rating, independent of PF.
Choose your whip and redundancy. See one clear total for the IT load the configuration supports.
Circuit configuration → Protected capacityDefault example: L6-30 · 208V · 30A · 80% · A/B redundant = 4.99 kW protected (PF 1.00).
L6-20 and L6-30 are single-phase 208V profiles. Three-phase options use line-to-line voltage and line current; verify the actual installed connector and PDU.
Use 80% as the default planning assumption. Only use 100% if the complete circuit, breaker, conductor and PDU path are approved for that continuous rating.
An A/B pair provides two physical feeds for one protected IT load. Each independent feed must support the full load after failover. This does not verify upstream independence.
One pair means one A whip and one B whip. Ten pairs means 20 physical whips, but only ten protected load allocations.
Redundancy presets: N, 2N; advanced N+1 and 2N+1. Calculations are browser-local, not live measurements or electrical certifications.
For an A/B pair, the two whips protect one IT load. We never add A and B together as usable protected capacity.
Across 1 A/B pair · 80% rating · PF 1
Estimated real power at the selected power factor; not a meter reading or verified contractual entitlement.
A + B are NOT added. Each side must support the same protected load after failover.
Nominal capacity at the selected rating, independent of PF.
Before the 80% rating factor.
Includes redundant feeds; not additional protected IT capacity.
Held for redundancy, not added to usable load.
Volts across load × amps / 1000 = 6.24 kVA per feed.
At 80% rating: 4.99 kVA per feed; estimated real power at PF 1: 4.99 kW per feed.
Protected load = N required feeds or A/B pairs; redundant feeds are not counted twice.
With balanced dual-corded loads, normal A/B split is approximately 2.5 kVA per side across all pairs. Surviving side must support 4.99 kVA after a full-path failure.
One complete A or B system may be lost while the other N system supports the protected load.
A 100% rating requires a fully verified 100%-rated electrical path; do not assume a 100%-rated breaker alone permits 100% continuous use. Planning estimate only. Confirm continuous-load limits, conductors, breakers, voltage, A/B independence, transfer behavior, upstream UPS/PDU capacity and redundancy design with the responsible electrical engineer.