Estimated project budget
$172,500,000Data Center Construction Cost/MW
Build a rough installed-cost budget and normalize it against planned IT power capacity.
Free · Manual inputs · No sign-in- 01Set the assumptions
7 inputs. Replace the examples with values for your scenario.
- 02Explore the result
Change an input to see how the estimate responds.
- 03Check the source
Use the formula and limitations below before acting.
Build your scenario
Enter illustrative values. Everything runs locally in your browser; this tool does not send your scenario to a server.
Total IT-side usable capacity at the modeled phase.
Land acquisition, grading and civil improvements.
Core, enclosure, structure and related works.
Substation-related site costs, distribution, UPS and backup power in this scope.
Cooling plant, heat rejection and mechanical infrastructure.
Design, permits, management and owner contingency before modeled percentage.
Applied to all listed project cost categories.
Example values are for demonstration only, not detected site, circuit or contract settings.
Your results
Installed cost per usable IT MW
$17,250,000Modeled contingency
$22,500,000Usable IT capacity
10 MWBase cost = land + shell + electrical + mechanical + soft costs; project cost = base × (1 + contingency%); cost/MW = project cost ÷ planned IT MW.
High-level conceptual estimate only. Excludes unspecified taxes, financing, phasing, utility delays, site conditions, and items not entered. Capacity denominator must be usable IT MW rather than facility service MW.
Ready for a deeper answer?
Free calculators model numbers you supply. A future paid workflow will connect source-cited contract terms, billing reconciliation, expert verification and reporting—subject to security and acceptance approval. No paid service is activated here.