Skip to content
ColoPreflightAI
← All calculators
ADDITIONAL CALCULATOR / SCENARIO STUDIO

Data Center Construction Cost/MW

Build a rough installed-cost budget and normalize it against planned IT power capacity.

Free · Manual inputs · No sign-in
Commercial modelCONCEPT VIEW
COST MODELΣ
01Power02Lease03Term
Connect the cost components before comparing the total.
  1. 01
    Set the assumptions

    7 inputs. Replace the examples with values for your scenario.

  2. 02
    Explore the result

    Change an input to see how the estimate responds.

  3. 03
    Check the source

    Use the formula and limitations below before acting.

01 / MODEL INPUTS

Build your scenario

Enter illustrative values. Everything runs locally in your browser; this tool does not send your scenario to a server.

Total IT-side usable capacity at the modeled phase.

Land acquisition, grading and civil improvements.

Core, enclosure, structure and related works.

Substation-related site costs, distribution, UPS and backup power in this scope.

Cooling plant, heat rejection and mechanical infrastructure.

Design, permits, management and owner contingency before modeled percentage.

Applied to all listed project cost categories.

Example values are for demonstration only, not detected site, circuit or contract settings.

02 / LIVE ESTIMATES

Your results

Calculated

Estimated project budget

$172,500,000

Installed cost per usable IT MW

$17,250,000

Modeled contingency

$22,500,000

Usable IT capacity

10 MW
HOW IT WORKS

Base cost = land + shell + electrical + mechanical + soft costs; project cost = base × (1 + contingency%); cost/MW = project cost ÷ planned IT MW.

IMPORTANT LIMITATIONS

High-level conceptual estimate only. Excludes unspecified taxes, financing, phasing, utility delays, site conditions, and items not entered. Capacity denominator must be usable IT MW rather than facility service MW.

ENTERPRISE · CONTRACT-LINKED

Ready for a deeper answer?

Free calculators model numbers you supply. A future paid workflow will connect source-cited contract terms, billing reconciliation, expert verification and reporting—subject to security and acceptance approval. No paid service is activated here.

Ask about enterprise analysis ↗
© ColoPreflight LLC · Illustrative planning estimates only · No customer data uploads or automated contract interpretation